Pool Project #3
/
Now that the deck is done it was time to connect the two decks to each other, the house and the pool.We decided to go for a simple pea gravel base with stone framing and pavers for the steps. First we measured and marked the area and then we (and when I say we I mean Guy) removed all the grassNext we started laying the stones
The final look (until the fall when we take on ripping out the yard and replanting the entire thing).